Our team at Dewey’s Septic and Grading has extensive experience in the septic industry, and you can count on us to provide the effective solutions you need to manage septic waste on your property. If your land is too far from a municipal sewer system to connect to that infrastructure, you will need to have a private septic tank installed. We have the right knowledge and experience to tackle all your septic tank installation needs, and in this article, we will provide an overview of how the process works.
- Evaluation, Design, and Permitting – Septic tank installation starts with evaluating the site and designing the new system. Our team will assess your land to determine the best place for your new tank to go, then design the rest of the system to best suit your needs. Once we have finalized the design, we will secure all necessary permits for the project.
- Excavation and Placement – The next phase in septic tank installation is excavation. Our team will dig holes for the septic tank, pipes, and other infrastructure, then lower these elements into place. We will also connect all the pieces of the septic system.
- Backfilling, Cleanup, and Testing – After your septic tank and pipes are in place, our team will move on to the final stage of septic tank installation. This phase starts with backfilling or moving the excavated soil back over the pits to bury the septic system. Then, we will clean up your site to make it look like new. Finally, we will test your new septic system to make sure everything is working properly.